Gira 289300

Gira E22 289300 Flush-Mounted 3-Gang Box Installation and Usage Manual

1. Bubuka

This manual provides detailed instructions for the proper installation and use of the Gira E22 289300 Flush-Mounted 3-Gang Box. Please read all instructions carefully before beginning installation to ensure safety and optimal performance of the product. This product is designed for professional electrical installation.

2. Produk Langkungview

The Gira E22 289300 is a flush-mounted box designed for integrating electrical switches, outlets, or other devices into a wall. It is part of the Gira E22 switch program, which offers a streamlined installation process for a flat wall finish. This specific model is a 3-gang box, allowing for the installation of three individual electrical components.

Fitur konci:

  • Designed for electrical switches and outlets
  • Dijieun di Jerman
  • Single package unit
Gira E22 289300 flush-mounted 3-gang box, red plastic housing.

Gambar 1: The Gira E22 289300 flush-mounted 3-gang box. This image displays the Gira E22 289300 flush-mounted 3-gang box. It is a rectangular, red plastic enclosure designed for electrical installations, featuring multiple compartments for wiring and device mounting. The internal structure shows dividers and mounting points for securing electrical components within a wall.

3. Spésifikasi

AtributNilai
Nomer Modél Item289300
ProdusénGira
Ukuran produk (L x W x H)5 x 5 x 5 cm
Beurat produk190.51 gram
Tipe PamasanganTembok Gunung
Bahanpalastik
Tipe Terminalsekrup
Voltage250 volt
Bahan KontakTambaga
Kakuatan diéléktrikAt least 4 kV/mm
Modeu OperasiOff-none-on
Spésifikasi patuhCE, TÜV, VDE
Teu diproduksi deui ku pabriknaNo
Kasadiaan suku cadangInpormasi teu sayogi

4. Pamasangan

The Gira E22 switch program introduces an innovative installation method. Utilizing a specialized mounting box, it can be installed flush with the wall surface. For flush-mounted installation within masonry, the E22 box is inserted into a dedicated E22 flush-mounted socket and then placed into the wall. The following steps detail the installation process for masonry:

Installation in Masonry:

  1. Nyiapkeun bubuka: Create a rectangular opening in the masonry. This can be done using tools such as a slot cutter, hammer, core drill, or chisel. Ensure the opening is appropriately sized for the E22 flush-mounted box.
  2. Insert and Secure the Box: Insert the Gira E22 flush-mounted box (compatible models include 2891 00, 2892 00, 2893 00, 2894 00) into the prepared opening. Align it precisely and secure it in place, for example, by using plaster.
  3. Apply Cleaning Protection: Place the designated cleaning protection over the flush-mounted E22 box. This protects the interior during subsequent plastering.
  4. Plaster the Wall: Proceed with plastering the wall, ensuring the flush-mounted box is fully integrated and the wall surface is smooth.
  5. Remove Protection and Cut Opening: Once the plaster has dried, carefully remove the cleaning protection and cut out the opening for the E22 box.
  6. Insert and Fasten E22 Box: Insert the E22 box into the newly exposed opening. Align it correctly and fasten it using the integrated claws. This fastening method is similar to that used for standard hollow wall boxes.
  7. Mount Devices and Cover Frames: Finally, mount the desired electrical devices (switches, outlets) and their corresponding cover frames onto the E22 box as per standard electrical installation practices.

Perhatosan Kasalametan: All electrical installations should be performed by a qualified electrician and comply with local electrical codes and regulations. Disconnect power at the main circuit breaker before beginning any installation work.

5. Nyuping

The Gira E22 289300 Flush-Mounted 3-Gang Box is a passive component designed to house active electrical devices. It does not have an 'operating' function in itself. Its purpose is to provide a secure and compliant enclosure for switches, outlets, or other electrical modules, allowing them to function correctly and safely within the wall structure.

6. Pangropéa

The Gira E22 289300 box requires minimal maintenance once installed. Ensure that the cover frames and devices are securely fastened and free from damage. For cleaning, gently wipe the visible surfaces of the installed devices and frames with a soft, dry cloth. Do not use abrasive cleaners or solvents. Periodically inspect for any signs of wear or damage, and consult a qualified electrician if any issues are observed.

7. Cara ngungkulan

As a passive housing component, the Gira E22 289300 box itself typically does not experience operational issues. Most problems would relate to the installation process or the electrical devices housed within it.

  • Leupas Saatos Dipasang: Ensure the box was properly secured with plaster and/or claws during installation. If the wall material has deteriorated, re-securing may require professional intervention.
  • Difficulty Mounting Devices: Verify that the E22 box is correctly aligned and that no debris obstructs the mounting points. Ensure you are using compatible Gira E22 series devices and frames.
  • Masalah listrik: If electrical problems occur (e.g., power loss, flickering), these are almost certainly related to the wiring or the devices themselves, not the box. Immediately consult a qualified electrician.

penting: Do not attempt to repair electrical components or wiring unless you are a qualified professional. Always disconnect power before inspecting any electrical installation.

8. Garansi jeung Rojongan

Specific warranty information for the Gira E22 289300 Flush-Mounted 3-Gang Box is not provided in this manual. For detailed warranty terms, technical support, or spare parts availability, please refer to the official Gira website or contact Gira customer service directly. Keep your purchase receipt as proof of purchase.

Pabrikan: Gira

Websitus: www.gira.com (Please check for your regional Gira websitus)

Dokumén Patali - 289300

Praview Gira Pushbutton sénsor 4.95 Parentah Operasi kanyamanan
Parentah operasi sareng detil téknis pikeun Gira Pushbutton Sensor 4.95 Komfort, ngawengku pamasangan, komisioning, operasi, sareng spésifikasi pikeun sistem bumi pinter.
Praview Sistim GIRA 106 Siram-dipasang Box Instalasi - Parentah dipasang
Instruksi pemasangan komprehensif pikeun kotak instalasi siram Sistim GIRA 106, detailing precautions kaamanan, step-demi-step prosedur instalasi, daptar komponén, dimensi, sarta spésifikasi teknis.
Praview GIRA Switching Actuator 2-geng / Buta Aktuator 16 A sareng Binér Input - Parentah Operasi
Instruksi operasi pikeun GIRA Switching Actuator 2-geng / Buta Actuator (model 5062 00). Manual ieu nyertakeun komponén alat, pungsi, kaamanan, ningkatna, commissioning, sarta data teknis pikeun sistem KNX.
Praview Gira IP Flush-Mounted Radio 2320 Installation and Operation Guide
Comprehensive guide for the Gira IP Flush-Mounted Radio 2320, covering installation, setup, operation, technical specifications, and troubleshooting. Learn how to connect speakers, set up Wi-Fi and Bluetooth, manage radio stations, and more.
Praview Gira IP Flush-Mounted Radio 2320 Operating Instructions
Comprehensive operating instructions for the Gira IP Flush-Mounted Radio (Item No. 2320), covering installation, setup, operation, technical specifications, and warranty information.
Praview Gira Project Assistant (IPK) v6.0 Release Catetan
Catetan sékrési rinci pikeun Gira Project Assistant (GPA) versi 6.0, nyertakeun syarat sistem, pamasangan, firmware anu cocog, fitur anyar, optimasi, perbaikan bug, sareng masalah anu dipikanyaho pikeun Gira pinter bumi sareng sistem otomatisasi gedong.