Trane 150-2050, 50M56-495-04, D345780P01

Trane Integrated Furnace Control Board User Manual

Model: 150-2050, 50M56-495-04, D345780P01, 5172C

1. Bubuka

This manual provides essential information for the proper installation, operation, maintenance, and troubleshooting of the Trane 12207310201376, 150-2050, 50M56-495-04, D345780P01 Ignition Control Board. This integrated furnace control board is designed to manage the ignition sequence and overall operation of compatible furnace systems. Please read this manual thoroughly before attempting any procedures.

2. Émbaran Kasalametan

PERHATOSAN: Résiko Sengatan Listrik sareng Bahaya Seuneu.

  • Pamasangan sareng ngalayanan kedah dilakukeun ku teknisi HVAC anu mumpuni.
  • Always disconnect power to the furnace before installing, servicing, or removing the control board.
  • Pastikeun sadaya sambungan kabel aman sareng sasuai sareng kode listrik lokal.
  • Ulah bypass sagala alat kaamanan.
  • Anggo alat pelindung diri (APD) anu pantes nalika pamasangan sareng perawatan.

3. Produk Langkungview

The Trane Ignition Control Board is a critical component responsible for controlling the ignition, flame sensing, and blower operations in a furnace. It integrates multiple functions into a single unit, ensuring efficient and safe furnace operation.

Trane 12207310201376 Ignition Control Board

Image showing the Trane 12207310201376 Ignition Control Board, a green circuit board with various electronic components, relays, capacitors, and terminal blocks. Key markings like "150-2050" and "5172C" are visible on the board.

4. Setup jeung Instalasi

Installation of the control board should only be performed by a qualified HVAC technician. Incorrect installation can lead to equipment damage, personal injury, or fire.

4.1 Léngkah-léngkah Pra-Pamasangan

  1. Verify that the replacement board matches the original board's specifications and model numbers.
  2. Pareuman sadaya daya listrik ka tungku di panel layanan utama.
  3. Label all wires connected to the existing control board for easy re-connection.

4.2 Prosedur Instalasi

  1. Cabut sadaya kabel tina papan kontrol anu lami kalayan ati-ati.
  2. Remove the old control board from its mounting.
  3. Mount the new Trane control board securely in the same location.
  4. Connect all wires to the corresponding terminals on the new board, referring to your labels and the furnace wiring diagram. Ensure all connections are tight and secure.
  5. Verify all connections before restoring power.

5. Parentah Operasi

The Trane Ignition Control Board operates automatically once installed correctly and power is restored to the furnace. It manages the sequence of operations for heating and cooling cycles based on thermostat demands.

5.1 Normal Operation Sequence (Heating)

  1. Thermostat nelepon pikeun panas.
  2. Control board initiates the inducer motor.
  3. Pressure switch closes, signaling safe venting.
  4. Igniter is energized (if applicable, depending on ignition type).
  5. Gas valve opens, and burners ignite.
  6. Flame sensor confirms ignition.
  7. After a delay, the circulating blower motor starts.
  8. Furnace heats until thermostat setpoint is reached.

The board continuously monitors safety limits during operation.

6. Pangropéa

The Trane Ignition Control Board generally requires minimal maintenance. However, periodic inspection of the furnace system is recommended by a qualified technician.

  • Ensure the furnace area is clean and free of dust and debris.
  • During routine furnace maintenance, have a technician inspect the control board for any signs of wear, corrosion, or loose connections.
  • Do not attempt to clean the board with liquids or abrasive materials.

7. Cara ngungkulan

Many furnace issues can be complex and require professional diagnosis. The following are general troubleshooting tips. Always disconnect power before inspecting components.

GejalaMungkin Cukang lantarananaAksi
Tungku teu hurungNo power, thermostat issue, safety limit open, faulty board.Check power supply, thermostat settings. Consult a technician for limit switch or board diagnosis.
Kompor teu hurungNo gas, faulty igniter, dirty flame sensor, faulty board.Ensure gas supply is on. Clean flame sensor. If issues persist, contact a technician.
Blower henteu lumpatFaulty blower motor, capacitor, or control board.Hubungi teknisi anu mumpuni pikeun diagnosis sareng perbaikan.

Many control boards have diagnostic LED lights that flash codes to indicate specific faults. Refer to your furnace's specific manual for interpreting these codes.

8. Spésifikasi

  • Pabrikan: Trane
  • Nomer modél: 150-2050, 50M56-495-04, D345780P01
  • Nomer Bagian: 12207310201376, 5172C
  • Tipe: Integrated tungku Control Board
  • Kasaluyuan: Designed for specific Trane furnace models. Verify compatibility with your furnace before purchase and installation.

9. Garansi jeung Rojongan

For warranty information regarding your Trane Ignition Control Board, please refer to the documentation provided at the time of purchase or contact the seller/manufacturer directly. Warranty terms and conditions may vary.

For technical support, installation assistance, or complex troubleshooting, it is highly recommended to contact a certified HVAC professional or the official Trane customer support.

Dokumén Patali - 150-2050, 50M56-495-04, D345780P01

Praview Buletin Layanan Kagagalan Dewan IFC Trane & American Standard - WAJIB DIOLAH
Buletin layanan resmi ti Trane sareng American Standard ngeunaan kagagalan papan Kontrol Tungku Terpadu (IFC) dina modél tungku khusus. Ngajéntrékeun kode kasalahan 5, modél anu kapangaruhan, sareng pitunjuk ngerjakeun ulang wajib.
Praview Tungku Gas Horizontal Arus Naék/Arus Turun Trane XL 80: Spésifikasi sareng Fitur
Pituduh lengkep pikeun tungku gas Trane XL séri 80 (modél TUD2 sareng TDD2), anu ngajelaskeun fitur, data kinerja, spésifikasi listrik, sareng diménsi pikeun aliran luhur, aliran handap, sareng pamasangan horizontal.
Praview Manual Pamasangan, Operasi, sareng Pangropéa Tungku Gas Trane & American Standard Seri S8
Pituduh lengkep pikeun pamasangan, operasi, sareng pangropéa Trane sareng American Standard S8 Series Upflow/Downflow/Horizontal Gas-Fired 1-Stage jeung 2-Stage Tungku Draft Induksi kalayan Motor Efisiensi Tinggi. Ngawengku peringatan kaamanan, spésifikasi, diagram kabel, sareng ngungkulan masalah.
Praview Tungku Gas Efisiensi Tinggi Trane XT95: Spésifikasi sareng Fitur
Data produk anu lengkep, fitur, kauntungan, spésifikasi, data kinerja, diagram kabel listrik, sareng diménsi pikeun séri Trane XT95 efisiensi tinggi, single-stage, tungku berbahan bakar gas, kondensasi, ventilasi langsung, dibantu kipas.
Praview Tungku Gas Seri Trane S9V2: Manual Pamasangan, Operasi, sareng Pangropéa
Pituduh lengkep pikeun masang, ngoperasikeun, sareng ngajaga Trane sareng American Standard S9V2 seri 2-stage tungku gas kondensasi kecepatan variabel. Ngawengku kaamanan, prosedur pamasangan, spésifikasi, sareng ngungkulan masalah.
Praview Trane S9V2 Seri Dua StagData Produk Tungku Gas Kondensasi e
Data produk sareng spésifikasi anu lengkep pikeun Trane S9V2 Series Two Stage Tungku Gas Kondensasi, ngawengku fitur, kauntungan, variasi modél, spésifikasi téknis, sareng tabel kinerja aliran hawa.