Perlegear PGSER02B

Perlegear 10U Open Frame Network Rack Instruction Manual

Model: PGSER02B

Merek: Perlegear

1. Bubuka

This manual provides detailed instructions for the assembly, installation, and operation of your Perlegear 10U Open Frame Network Rack (Model PGSER02B). Please read this manual thoroughly before installation to ensure proper setup and safe use. Keep this manual for future reference.

Perlegear 10U Open Frame Network Rack, front view with two vented shelves installed.

Figure 1: Perlegear 10U Open Frame Network Rack with shelves.

2. Émbaran Kasalametan

Observe the following safety precautions during assembly and use:

  • Pastikeun sadaya komponén aya sareng henteu ruksak sateuacan dipasang.
  • Do not exceed the maximum load capacity of 200 lbs for the rack and 22 lbs for the top panel.
  • When wall-mounting, ensure the mounting surface (e.g., wood studs, concrete wall) can safely support the rack's weight and its contents. Do not mount on drywall alone.
  • Use appropriate tools and follow all installation steps carefully.
  • Jauhkeun barudak jeung piaraan ti wewengkon assembly.

3. Eusi Paket

Pastikeun yén sadaya bagian kalebet dina pakét anjeun:

Diagram showing all components included in the Perlegear 10U Network Rack package: Rack Frame x2, Shelf x2, Back Brace x2, Front Brace x2, M6 Bolt x40, Cage Nut x8, M6 Nut x12, Wall Anchor x6, Lag Screw x6, Wall Plate Template.

Gambar 2: Eusi Pakét Lengkep.

  • Rack Frame (x2)
  • Rak (x2)
  • Back Brace (x2)
  • Front Brace (x2)
  • Baut M6 (x40)
  • Cage Nut (x8)
  • Kacang M6 (x12)
  • Jangkar Tembok (x6)
  • Lag Screw (x6)
  • Wall Plate Template (x1)

4. Spésifikasi

FiturSpésifikasi
Nomer modélPGSER02B
Rack Units (U)10U
Ukuran produk (D x W x H)20.12" x 20.5" x 19.39" (51.1cm x 52.1cm x 49.2cm)
Item Beurat30.5 lbs (13.8 kg)
BahanBaja gulung tiis
WarnaHideung
Max Load Capacity (Rack)200 lbs (90.7 kg)
Max Load Capacity (Top Panel)22 lbs (10 kg)
Kasaluyuan19-inch networking, AV, and IT equipment
Diagram showing the product dimensions of the Perlegear 10U Open Frame Network Rack, including depth, width, and height, along with a visual representation of the included hardware kit.

Figure 3: Product Dimensions and Hardware Kit Overview.

5. Setup jeung Instalasi

The Perlegear 10U Open Frame Network Rack offers flexible installation options: wall-mounted or floor-standing. Follow these steps for assembly and installation.

5.1. Majelis Leuwihview

Three-step diagram showing the assembly process: 1. Assemble Frame, 2. Mount to Wall, 3. Install Shelves.

Figure 4: Simple Setup Overview.

5.2. Detailed Assembly Steps

Kanggo pituduh visual, mangga tingali pidéo pamasangan resmi di handap ieu:

Video 1: Perlegear 10U Network Rack Installation Tutorial. This video demonstrates the step-by-step assembly and installation process for the rack.

  1. Kumpulkeun pigura:
    • Identify the Left and Right Frames, Back Braces, and Front Braces.
    • Attach the Back Braces to the bottom of the Left and Right Frames using M6 Bolts and M6 Nuts. Ensure the side with three holes on the frame faces the front.
    • Attach the Front Braces to the top of the Left and Right Frames, again ensuring the side with three holes faces the front. The 'PERLEGEAR' logo on the front brace should be visible.
    • Tighten all M6 Nuts using a PH2 or PZ2 screwdriver and a 10mm wrench for secure assembly.
  2. Pasang Rak:
    • Insert the two 1U vented shelves into the desired rack unit positions.
    • Utilize the provided shelf reinforcement brackets to support the shelves and prevent sagging, especially for heavier equipment. These brackets can be installed on one shelf or across two different shelves for added stability.
    Diagram illustrating two options for shelf reinforcement: installing both brackets on one shelf or installing brackets on two different shelves.

    Figure 5: Shelf Reinforcement Options.

  3. Pilihan Pasang:
    • Floor-Standing: Place the assembled rack on a stable, level surface. The rack includes caster holes at the bottom for optional mobility (casters not included).
    • Dipasang dina témbok: Use the provided drilling template to mark pilot holes. Mount the rack to 16-inch wood studs (without anchors) or concrete walls (with anchors) using the lag screws. Ensure the rack is securely fastened before loading equipment.
    Image showing the Perlegear 10U rack in two configurations: wall-mounted with equipment and floor-standing with a laptop on top and equipment inside.

    Figure 6: Flexible Setup - Wall-mounted and Floor-standing configurations.

6. Parentah Operasi

Once assembled and installed, the Perlegear 10U Open Frame Network Rack is ready for use.

6.1. Instalasi Parabot

  • Install your 19-inch rack-mounted networking, AV, and IT equipment into the rack units.
  • Utilize the two 1U vented shelves for non-rack-mountable devices such as smaller switches, storage devices, or UPS units.
  • Ensure proper cable management to maintain airflow and prevent obstruction.
Image showing a wall-mounted Perlegear 10U rack filled with various 19-inch networking and AV equipment, highlighting the 10U space and compatibility with 16-inch wood studs.

Figure 7: Rack with 10U Space and Equipment.

6.2. Aliran Udara sareng Pendinginan

The open frame design and vented shelves promote optimal airflow, which is crucial for keeping your networking, audio, and video equipment cool and preventing overheating.

Diagram showing a wall-mounted Perlegear 10U rack with equipment, illustrating airflow arrows to demonstrate how the open rack and vented shelves help improve cooling.

Figure 8: Enhanced Airflow for Equipment Cooling.

6.3. Kamungkinan pikeun ngalegaan

This server rack features an expandable design. You can stack two 10U racks to create a 20U rack, doubling your storage capacity for growing equipment needs. Ensure to remove the top panel of the bottom rack when stacking.

Image showing two Perlegear 10U racks stacked to form a 20U rack, with a close-up of the caster holes at the bottom (casters not included).

Figure 9: Stackable Design for Increased Capacity.

Image showing a Perlegear 10U rack with equipment, positioned under a staircase, demonstrating how additional items can be stored on the top surface of the rack.

Figure 10: Utilizing the Top Surface for Additional Storage.

7. Pangropéa

Regular maintenance ensures the longevity and optimal performance of your network rack:

  • beberesih: Wipe the rack surfaces with a soft, dry cloth to remove dust. For stubborn marks, use a mild, non-abrasive cleaner.
  • Pamariksaan: Periodically check all bolts and nuts to ensure they remain tight. Re-tighten if necessary.
  • Pariksa beban: Verify that the total weight of equipment does not exceed the maximum load capacity.

8. Cara ngungkulan

If you encounter any issues, consider the following:

  • Instabilitas rak: Ensure all bolts and nuts are securely tightened. If wall-mounted, confirm the mounting hardware is correctly installed into appropriate structural supports.
  • Equipment Overheating: Check for proper cable management that might obstruct airflow. Ensure the rack is not placed in an enclosed space without adequate ventilation.
  • Difficulty Installing Equipment: Verify that your equipment is 19-inch rack-mountable. Ensure cage nuts are correctly inserted into the square holes before attaching equipment with M6 bolts.

9. Garansi jeung Rojongan

Perlegear products are designed for durability and performance. For warranty information, technical support, or to purchase replacement parts, please visit the official Perlegear websitus atanapi hubungi layanan palanggan ngalangkungan pangecér anjeun.

Dokumén Patali - PGSER02B

Praview Perlegear PGSER02 Server Computer Rack Instruction Manual
Detailed instruction manual for assembling and installing the Perlegear PGSER02 Server Computer Rack. Includes parts list, tools required, safety warnings, and step-by-step installation guides for wood stud and solid concrete walls.
Praview Perlegear PGTVMC04 TV Stand Instruksi Manual
Comprehensive assembly and safety guide for the Perlegear PGTVMC04 mobile TV stand with casters. This manual provides detailed instructions, parts lists, hardware specifications, and step-by-step procedures for securely mounting televisions and shelves.
Praview Patarosan anu Sering Diajukan pikeun Pemasangan TV Perlegear dina Tembok (FAQ)
Milarian jawaban kana patarosan umum ngeunaan dudukan TV Perlegear dina témbok, kalebet pola VESA, jinis témbok, tantangan pamasangan, sareng léngkah ngungkulan masalah.
Praview Perlegear PGFS06 Floor TV Stand Instruction Manual
Comprehensive instruction manual for the Perlegear PGFS06 Floor TV Stand. This guide provides detailed steps for compatibility checks, assembly, TV mounting, shelf installation, cable management, and adjustments, ensuring a secure and optimal TV setup.
Praview PERLEGEAR PGFS10/PGFS10W TV Stand Assembly Instructions
Comprehensive guide for assembling the PERLEGEAR PGFS10 and PGFS10W TV stands, including compatibility checks, parts list, and step-by-step instructions with safety precautions.
Praview Perlegear PGFS09 Floor TV Stand Instruction Manual
Comprehensive instruction manual for the Perlegear PGFS09 Floor TV Stand, detailing assembly, compatibility checks, and safety guidelines for mounting TVs from 32 to 70 inches.